downsized_0418091908.jp
Originally uploaded by thebicycleescaThe Leesburg Bakers Dozen was met with beautiful weather. Our SSO crew is recovering from the 7.5 mile lap.
Trail Work
Originally uploaded by thebicycleesWith over 70 volunteers the Frederick Water Shed trail work day was very well attended. Special thanks to Frederick City Transportation planner Tim Davis for all his help making this possible.
Tour of Walkersville racers braving the very high winds.
